The Half-Track was fairly complete and in running condition. New tracks, tires and tarpaulin covers were put on the vehicle
First jobs done:
Frame and axles were brushed off to the metal surface.
After overhauling the running gear, it was given a new paintjob, as well as the other sheetmetal.
During the first rides in terrain, we had electrical problems, much later we found out that these problems were caused by a loose connection at the ignition switch.
back